• Home
  • Company
    • About Us
    • Management
      • Board of Directors
      • Key Personnel
  • Project Overview
    • Salient Features
    • Project Milestones
    • Details of Right of Way Available / Not Available
  • Investor
    • Annual Return
    • Annual Report
    • Grievance
  • Gallery
  • Contact
  • Home
  • Company
    • About Us
    • Management
      • Board of Directors
      • Key Personnel
  • Project Overview
    • Salient Features
    • Project Milestones
    • Details of Right of Way Available / Not Available
  • Investor
    • Annual Return
    • Annual Report
    • Grievance
  • Gallery
  • Contact

Welcome to GR ENA KIM EXPRESSWAY PRIVATE LIMITED

GR Ena Kim Expressway Private Limited (“GEKEPL” or the “Company”) is a Special Purpose Vehicle (SPV), incorporated on August 20, 2020 for implementation of the Project “Eight lane access-controlled Expressway from Km 217.500 to Km 254.430 of Vadodara Mumbai Expressway (Ena to Kim Section) in the State of Gujarat on Hybrid Annuity Mode under BharatmalaPariyojana (Phase -I, Package -VI)”. GR Infraprojects Limited (GRIL), controls 100% of the equity interest in GEKEPL.

Total Length of Project i.e.36.930 Km and total project cost set forth in financial package as per clause 23.1 of Article 23 is 2187 Cr. The LOA for the project was issued by Authority (NHAI) on 30July 2020 and Agreement was signed on 7October 2020.

Take the Next Step…
Get in Touch with a Solution Expert

Contact

Our Latest Gallery

  • All
  • Structure Progress
  • Highway Progress
  • Quality Control
  • Safety Features

VOP at Ch. 228+220

Tapi Bridge

Tapi Bridge 1

ROB 221+549

MJB at Ch. 246+639

Flyover at ch. 224+997

VOP

Tapi River MJB

Tapi 237+768 Segment Erection RHS P8-P9

Completion of IC over NH-4

237+738 Tapi MJB Segment launching WIP P8-P9 LHS

218+100 Toll Plaza construction WIP

Toll Plaza

Interchange at NH6

Enterchange at VME

Highway

Highway

Highway

Toll Plaza Conope work done

MCW Work Completed with Miscellaneous

Interchange location work in Progress

Turfing work 233+900

MCW completion at Ch. 249+200 BHS

PQC Laying at 232+160 to 232+290 LHS

Tharmoplast retro reflective test

RO & PD site visit

Thermoplast Thickness Measurement Digital Thickness gauge

Stripping value test of Bitumen

Core cutting test @224+900 LHS

PQC Slump Cone Test

Quality Control

Quality Control

Quality Control

Quality Control

Quality Control

Quality Control

Plantation @ Loop Ramp Location

Median plantation @ Ch.249+050

Median plantation @ Ch. 217+600

TL Sir

RO Sir, Gandhinagar

PD Sir

Mass TBT regarding electrical safety & Work at height

TBT conducted for Working at height and Environment awareness

Manpower Tool Box Training Conducted by Safety Team

Safety Features

Safety Features

Safety Features